Gateway Crescent
project details
ICP Works & Electrical BoP
The full civil & electrical engineering design and build works
Design and build 33kV DNO S/S building (inside existing warehouse to ENWL specification)
ENW Substation built on raised steel platform
Client Side Switchroom (inside existing warehouse)
1 x client side 33kV Interface collector switchboard (8 x panel)
1 x 100kVA Padmount Auxiliary Supplies Transformer
Internal building alterations to accommodate BESS installation
Internal air circulation/extraction system (if required following heat generation survey)
Installation of fan units and louvres to col building when battery units operate
6 x 3.63MVA PCS Power Electronics inverter units (PE FREEMAQ PCSK – 660V-AC)
6 x Power Electronics single MV Skids with 6 x 3,700KVA Transformers (no RMUs)
61 x 372.7KWh of CATL LFP Water Cooled (next generation) battery racks
Battery Connection Panels
Plant Local Controller with all associated control and monitoring systems
All associated cable works (MV, LV, AC & DC)
Full commissioning of whole system
Complete Fire Risk Assessment of the project and associated warehouse
Mesh fitted to external fence
Electric fencing
External Transformer Compound area
Project Statistics
Project:
20MW Battery Storage project
Completed:
Completed August 2022
Output:
33kV
Location:
Oldham
DNO:
Need help with a project?
other projects
Completed:
December 2020
Output:
110kV
Drumkee
Contestable, Client-side & BoP works
Completed:
January 2021
Output:
110kV
Mullavilly
Contestable, Client-side & BoP works
Completed:
2020
Output:
132kV
Minety
Contestable, DNO & IDNO, Client Side & BoP