Mitie expands battery energy storage and electrical engineering capabilities with addition of former G2 energy team, learn more here

Gateway Crescent

project details
ICP Works & Electrical BoP
  • The full civil & electrical engineering design and build works
  • Design and build 33kV DNO S/S building (inside existing warehouse to ENWL specification)
  • ENW Substation built on raised steel platform
  • Client Side Switchroom (inside existing warehouse)
  • 1 x client side 33kV Interface collector switchboard (8 x panel)
  • 1 x 100kVA Padmount Auxiliary Supplies Transformer
  • Internal building alterations to accommodate BESS installation
  • Internal air circulation/extraction system (if required following heat generation survey)
  • Installation of fan units and louvres to col building when battery units operate
  • 6 x 3.63MVA PCS Power Electronics inverter units (PE FREEMAQ PCSK – 660V-AC)
  • 6 x Power Electronics single MV Skids with 6 x 3,700KVA Transformers (no RMUs)
  • 61 x 372.7KWh of CATL LFP Water Cooled (next generation) battery racks
  • Battery Connection Panels
  • Plant Local Controller with all associated control and monitoring systems
  • All associated cable works (MV, LV, AC & DC)
  • Full commissioning of whole system
  • Complete Fire Risk Assessment of the project and associated warehouse
  • Mesh fitted to external fence
  • Electric fencing
  • External Transformer Compound area

Project Statistics

Project: 20MW Battery Storage project
Completed: Completed August 2022
Output: 33kV
Location: Oldham
DNO:
Need help with a project?

other projects