project details
Electrical BoP
  • Site Set Up & Site Management as Principal Designer and Principal Contractor under CDM Regulations
  • In-house Electrical Design including Site Layout; SLD; Protection Diagrams; Cable Layout Plans; AC / DC Schematics Drawings; Multicore Layout & Schedules; Earthing Layout & P28, P29, G5/4 System Studies
  • In-house Civil Design including Battery Container Foundations; Invertor & Transformer Skid Foundation; Switchgear accommodation and foundation design; Internal Access Track Design & Cable Containment
  • All associated testing and commissioning
  • Supply, installation and testing of GRP enclosure for main 1250A Switchboard; 33kV switchboard; battery and charger; switchgear protection scheme & National Grid interface panel
  • Supply, installation and testing of 33kV Transformers and Earthing Transformers
  • Supply and installation of Substation foundation; BESS Container foundations; Transformer foundations and associated site piling
  • Supply and installation of 33kV cable ducting and above ground cable containment as required throughout site
  • Installation of underground Earthing system
  • Installation of access track
  • Supply and install steel security fence around site
  • Site landscaping as required
  • Offload and positioning, plus installation of Battery Containers; auxiliary transformers; 33kV transformers; Earthing transformers & GRP substation enclosure
  • 33kV & LV Cable installation and jointing
  • Above ground Earthing installation
  • Excavate and backfill UKPN 11kV Cable trenches
  • Supply, Install and Construct UKPN 11kV GRP substation, plus enclosure and associated switchgear, Earthing and groundworks

Project Statistics

Project: 50MW Battery Storage project
Completed: August 2021
Output: 33kV NG Transmission Connections
Location: Kent
DNO: