Site Set Up & Site Management as Principal Designer and Principal Contractor under CDM Regulations
In-house Electrical Design including Site Layout; SLD; Protection Diagrams; Cable Layout Plans; AC / DC Schematics Drawings; Multicore Layout & Schedules; Earthing Layout & P28, P29, G5/4 System Studies
In-house Civil Design including Battery Container Foundations; Invertor & Transformer Skid Foundation; Switchgear accommodation and foundation design; Internal Access Track Design & Cable Containment
All associated testing and commissioning
Supply, installation and testing of GRP enclosure for main 1250A Switchboard; 33kV switchboard; battery and charger; switchgear protection scheme & National Grid interface panel
Supply, installation and testing of 33kV Transformers and Earthing Transformers
Supply and installation of Substation foundation; BESS Container foundations; Transformer foundations and associated site piling
Supply and installation of 33kV cable ducting and above ground cable containment as required throughout site
Installation of underground Earthing system
Installation of access track
Supply and install steel security fence around site
Site landscaping as required
Offload and positioning, plus installation of Battery Containers; auxiliary transformers; 33kV transformers; Earthing transformers & GRP substation enclosure
33kV & LV Cable installation and jointing
Above ground Earthing installation
Excavate and backfill UKPN 11kV Cable trenches
Supply, Install and Construct UKPN 11kV GRP substation, plus enclosure and associated switchgear, Earthing and groundworks